Assessment & Surveying
Stacks Image 4805
edge

An international NGO with operations in Pakistan was concerned by recent indications of increased threat to western interests in the country. An in-depth assessment was conducted, including deployment to several locations within Pakistan, and the NGO’s profile in each location assessed. A range of risk mitigation options were proposed, set against a trigger-based risk management programme, and the organisation was able to continue operations in the knowledge that their specific risk profile was acceptable and could be tracked against future threat trends.

edge

A large international pharmaceutical company with regional administrative headquarters in Lebanon identified a need for new premises. A series of surveys were conducted for all business-suitable locations, and detailed conclusions on relative risk factors affecting each site were presented to the company board. Based on the surveys the company was able to select a location which optimally met its business needs and which was in the most secure location available.

Stacks Image 4680
Stacks Image 5000

© 2014 LPD Risk Management