Assessment & Surveying
Stacks Image 4805

An international NGO with operations in Pakistan was concerned by recent indications of increased threat to western interests in the country. An in-depth assessment was conducted, including deployment to several locations within Pakistan, and the NGO’s profile in each location assessed. A range of risk mitigation options were proposed, set against a trigger-based risk management programme, and the organisation was able to continue operations in the knowledge that their specific risk profile was acceptable and could be tracked against future threat trends.


A large international pharmaceutical company with regional administrative headquarters in Lebanon identified a need for new premises. A series of surveys were conducted for all business-suitable locations, and detailed conclusions on relative risk factors affecting each site were presented to the company board. Based on the surveys the company was able to select a location which optimally met its business needs and which was in the most secure location available.

Stacks Image 4680
Stacks Image 5000

© 2014 LPD Risk Management